New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →Upstream inputs are the fabrication machines, specialty chemicals and ultra-pure gases that a fab depends on. They are among the least visible links in the chip supply chain, and supply of them is concentrated in a few hands. India's Semicon 2.0 (₹1,27,500 crore) now gives "Machines and Materials" a pillar of its own [2]. This marks a shift from attracting fabs to securing the inputs that keep them running.
Strategic significance of upstream inputs
- Chokepoints: Only a few global firms supply advanced tools and process chemicals. If any of them is cut off, even a large fab stops working.
- Dual-use leverage: Chips run defence, telecom and AI systems, so whoever controls equipment and materials can deny technology to others.
- Continuous dependence: A fab uses gases and chemicals every day. If they are all imported, a "domestic" fab stays dependent on imports.
- Value addition: Materials and equipment take India's value addition beyond final assembly [1].
- Spillovers: Inputs such as copper foil, used in CCL for PCBs and in Li-ion cells, connect chips to batteries and EVs [1].
India's policy response
- Pillar 2 of Semicon 2.0: Supports plants for semiconductor-grade raw materials and for equipment [3]. It aims to attract at least 3 major equipment makers and 5 chemicals and gases companies. The application portal for Pillars 2, 3 and 4 opened on 6 Nov 2026 [1].
- Whole-ecosystem design: Six pillars cover design, materials, fabs, ATMP/OSAT, R&D and talent. ISM is the nodal agency, and applications stay open for 3 years [2].
- Anchor demand: Semicon 1.0 has approved 12 projects worth over ₹1.64 lakh crore [1]. Most are packaging units (8 of the first 10), which local suppliers can serve [4].
- ECMS (MeitY): 118 approvals across 16 States, with ₹77,051 crore of expected investment. These include the first-ever approvals for copper foil, cathode active material and specialty ceramics. About half the approved units are MSMEs [1].
- Talent: The Chips to Startup programme gives students and startups access to EDA tools [1].
Gaps to watch
- Only 5 of 12 Semicon 1.0 projects were in commercial production by Oct 2026 [1]. Suppliers need working fabs as customers.
- Fund utilisation was 23% in 2023-24 and 9% in 2024-25, because incentives are paid only when milestones are met [5]. ISM 2.0 received only ₹1,000 crore for 2026-27 [6].
Upstream inputs decide whether India's fabs are truly its own or merely located in India. Semicon 2.0 and ECMS rightly target these chokepoints. To deliver results, India should fund pillars in phases, publish milestone-wise progress and work with trusted partners. That would build a resilient, self-reliant chip base in line with Atmanirbhar Bharat and SDG 9.
Sources
- 1Union Minister Ashwini Vaishnaw Launches Semicon 2.0 Web Application Portal and Announces 12 Approved Applicants under ECMS (PIB, 6 Nov 2026)Pillar 2 targets, portal launch, Semicon 1.0 status, ECMS approvals, first-ever material approvals, MSME share, C2S, copper foil uses
- 2Semicon 2.0 scheme page, India Semiconductor Missionoutlay, six pillars, ISM as nodal agency, 3-year application window
- 3Semicon 2.0 Pillar 2: Machines and Materials, India Semiconductor Missionsupport for raw-material and equipment manufacturing
- 4Semicon India Programme Advances with Approval of 10 Projects (PIB, 2026)2 fabs and 8 packaging units
- 5PRS India, Demand for Grants 2025-26 Analysis: Electronics and Information TechnologySemicon India fund utilisation of 23% and 9%
- 6PRS India, Demand for Grants Analysis 2026-27: MeitYISM 2.0 allocation of ₹1,000 crore; milestone-linked disbursal