·The Hindu·15 marks·250–350 wordsS&T

Fusion is often called the 'holy grail' of clean energy. Discuss its prospects and limitations compared with fission.

New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →
In this answer
  1. Prospects: where fusion beats fission
  2. Limitations: where fission still leads
  3. Way forward

Almost all nuclear power today comes from fission, in which uranium atoms are split in a controlled chain reaction. Fusion joins deuterium and tritium (two isotopes of hydrogen) into helium [1]. Its promise is clean, firm power. Its limitation is stark: no tokamak has yet produced net energy for commercial power [1].

Prospects: where fusion beats fission

  • Cleaner output: D-T fusion gives off inert helium and a neutron, with no CO₂ [1]. It also avoids the long-lived spent fuel that fission leaves behind.
  • Inherently safe: There is no chain reaction to run away. If confinement fails, the plasma touches the wall, cools and stops, so a meltdown is not possible [1].
  • Fuel security: Deuterium is plentiful in seawater. This would reduce India's dependence on scarce uranium.
  • Science gains for India: India pays about 10% of ITER's cost but gets the know-how for the whole project [2]. Firms such as L&T and Inox India, and around 200 Indian scientists, work on it [3].

Limitations: where fission still leads

  • Containment problem: Fusion needs temperatures hotter than the Sun's core, which no material can withstand. Magnetic confinement has not yet given net energy gain [1].
  • Maturity gap: Fission is commercial today. ITER is only an experiment and is not built to supply electricity. Its schedule has slipped repeatedly, so commercial fusion power is still decades away.
  • Materials and waste: Fast neutrons make the reactor structure radioactive. Tritium is scarce and has to be bred.
  • Cost and coordination: The Cabinet approved India's ITER participation at a base cost of ₹2,500 crore [4]. India pays its roughly 9% share mostly as parts made at home, and one late part can hold up the whole machine [5].
              Fission            Fusion
Status        Commercial         Experimental
Waste         Long-lived fuel    Activated structure
Safety        Chain-reaction     Self-stopping

Fig: Fission and fusion compared

Way forward

  • Base power for 2047 on fission (the three-stage programme and SMRs) plus renewables.
  • Use ITER skills, ADITYA and SST-1 to build an Indian demonstration fusion reactor, which DAE says is the aim of joining ITER [2].

Fusion is the "holy grail" in what it promises, not yet in what it delivers. India should fund it as a long-term bet on science and industrial skills, while fission and renewables carry its near-term SDG-7 and net-zero-2070 goals.

Sources

  1. 1The Hindu, "How do tokamaks work to make nuclear fusion possible?" (6 Nov 2026)fission vs fusion, D-T products, containment, no net commercial energy
  2. 2Lok Sabha Unstarred Question No. 5922, Department of Atomic Energy (ITER)about 10% of the cost for know-how of the whole project; goal of an Indian demonstration reactor
  3. 3Embassy of India, Paris: Prime Minister and President of France jointly visit ITER facility (12 Feb 2025)about 200 Indian scientists; Indian industry partners
  4. 4PIB: Cabinet approval for Indian Participation in ITER (2007)₹2,500 crore base cost
  5. 5Lok Sabha Unstarred Question No. 989, Department of Atomic Energy (ITER)about 9.09% share, mostly paid in parts
Practice
8 questions on this article
Check the answer for each question, or reveal all at once.
Practice MCQs →

More from this note

More on S&T