The proliferation of low-cost drones has altered the air-defence calculus on India's borders. Discuss India's layered counter-UAS response and its gaps.
New · District CollectorCan you hold the district for 72 hours?Floods, a heatwave, an outbreak, a grievance queue. Take the decisions, see the consequences.Play →Small, low-flying drones are hard for conventional air-defence radars to spot, because those radars were built to track aircraft [2]. Cheap drones now force the use of costly sensors and weapons, so India is building a layered counter-UAS (C-UAS) grid. The grid is taking shape but is still uneven.
How drones changed the calculus
- Cost asymmetry: a cheap drone can tie down expensive air-defence assets.
- Saturation: many small targets arriving at once call for target prioritisation, which the new LLLR-I provides [1].
India's layered response
- Detection ("eyes"): a ₹770-crore contract with BEL for the Improved Low Level Light Weight Radar (LLLR-I), which tracks fighter-sized targets and mini- and micro-drones for the Army [1].
- Fire control: a contract worth about ₹2,000 crore for Air Defence Fire Control Radars, placed under the Buy (Indian-IDDM) category [3].
- Wider air picture: the Ashwini Low-Level Transportable Radar [4] and Mountain Radars [5] for the IAF.
- Interdiction ("shooter"): in December 2025 the DAC granted Acceptance of Necessity (AoN) for IDDIS Mk-II, which protects assets in the tactical battle area and hinterland, along with loiter munitions [2].
Detect (LLLR-I, LLTR) → Track/Prioritise (ADFCR) → Neutralise (IDDIS Mk-II)
Fig: India's counter-UAS kill chain
Gaps
- Sensor–shooter mismatch: LLLR-I has a signed contract, but IDDIS Mk-II has only an AoN [1][2]. Units may be able to see drones they cannot yet stop.
- Slow cycles versus fast-changing technology: it took about 10 months to go from AoN to contract, and delivery has not yet begun [1][2]. DAP 2020 brought in single-stage AoN and integrated trials [6]. Even so, the Standing Committee on Defence has pressed for time-bound procurement reform [7].
- Thin disclosure: the contract value is public, but the number of units, the delivery schedule and the indigenous content are not [1].
- Supplier concentration: four major radar orders have gone to one DPSU, BEL [1][3][4][5]. A delay at one firm could hold up several programmes at once, and the private supplier base stays thin.
India has moved counter-drone capability from ad hoc buying to planned, indigenous procurement. The way forward is to:
- buy the sensor and the shooter as one package;
- create a fast-track DAP window for C-UAS systems;
- report delivery dates to Parliament, not just signing dates;
- widen private-sector participation.
Together these steps would turn Aatmanirbhar Bharat into a credible shield for India's borders.
Sources
- 1Centre inks ₹770-crore pact with BEL for low-level radars (The Hindu, news report, 22 Oct 2026)LLLR-I value, capabilities, target prioritisation, Army end-user
- 2Defence Acquisition Council clears proposals worth ₹79,000 crore to enhance capabilities of Armed Forces (All India Radio News, 29 Dec 2025)AoN for LLLRs (small, low-flying UAS), IDDIS Mk-II, loiter munitions
- 3Aatmanirbhar Bharat: MoD inks Rs 2,000 crore contract with BEL for Air Defence Fire Control Radars for Indian Army (PIB)ADFCR contract under Buy (Indian-IDDM)
- 4Aatmanirbhar Bharat: Rs 2,906 crore contract signed with BEL for Low-level Transportable Radar (Ashwini) for IAF (PIB)Ashwini LLTR order
- 5Defence Ministry signs ₹1,950 crore contract with Bharat Electronics Limited (All India Radio News)Mountain Radars for IAF
- 6Defence Acquisition Procedure 2020 (Ministry of Defence)single-stage AoN, integrated trials
- 7Standing Committee on Defence (2024-25), 18th Lok Sabha, 13th Reportcall for time-bound procurement reform
Practice
7 questions on this article
Check the answer for each question, or reveal all at once.