·PIB

PARLIAMENT QUESTION: NUCLEAR ENERGY MISSION FOR VIKSIT BHARAT

In this note
  1. At a Glance
  2. Why in the News
  3. Background & Evolution
  4. Core Static Facts
  5. Multi-Dimensional Analysis
  6. Recent Developments (last 12–18 months)
  7. Prelims Hooks
  8. Mains Relevance
  9. Related Topics to Study Next
  10. Common Errors / Trap Areas
Practice
12 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →

1. At a Glance

  • Nuclear Energy Mission (NEM), announced in Union Budget 2025–26, targets 100 GWe nuclear capacity by 2047 to support Viksit Bharat and net-zero by 2070 [1].
  • Aims to operationalise at least five indigenous Small Modular Reactors (SMRs) by 2033 [1].
  • Backed by the newly enacted SHANTI Act, 2025, which liberalises private participation in India's nuclear sector for the first time [1][3].
  • Tests both static nuclear-policy knowledge (Atomic Energy Act, AERB) and dynamic 2025–26 legislative/budgetary developments — a classic GS-II/GS-III crossover topic.

2. Why in the News

  • PIB Delhi issued a Parliament Question response dated 22 July 2026 on the status of the Nuclear Energy Mission, detailing SMR designs and the SHANTI Act framework [1].
  • The SHANTI Bill, 2025 was passed by Lok Sabha (17 Dec 2025) and Rajya Sabha (18 Dec 2025), and received Presidential assent on 21 December 2025 [3][5].
  • A PIB workshop on "SHANTI Act, 2025: Enabling India's 100 GW Nuclear Power Roadmap through Public–Private Partnership" was subsequently held [4].

3. Background & Evolution

  • India's civil nuclear programme has historically been governed by the Atomic Energy Act, 1962 and the Civil Liability for Nuclear Damage Act, 2010, both public-sector-monopoly frameworks [3].
  • Union Budget 2025–26: Finance Minister announced the Nuclear Energy Mission with an outlay of ₹20,000 crore for SMR research, design, development and deployment [6].
  • December 2025: SHANTI Bill introduced in Lok Sabha (15 Dec 2025), passed by both Houses, and enacted as the SHANTI Act, 2025 — consolidating/replacing the 1962 and 2010 laws to allow private and foreign participation [3][5].
  • 2026: BARC's SMR design work (BSMR-200, SMR-55, HTGCR) reported to Parliament, alongside continuing capacity roadmap disclosures [1][2].

4. Core Static Facts

Item Detail
Nodal Department Department of Atomic Energy (DAE) [1]
Mission Nuclear Energy Mission (NEM), Union Budget 2025–26 [1][6]
Budget outlay ₹20,000 crore for SMR R&D and deployment [6]
Capacity target 100 GWe nuclear power by 2047 [1]
SMR target ≥5 indigenous SMRs operational by 2033 [1]
Current capacity (approx.) ~8 GW [6]
Enabling law SHANTI Act, 2025 — replaces/consolidates Atomic Energy Act, 1962 and Civil Liability for Nuclear Damage Act, 2010 [3]
Regulator Atomic Energy Regulatory Board (AERB) — regulatory oversight over all nuclear facilities, public or private [2]
Liability structure Graded operator liability ₹100 crore to ₹3,000 crore based on facility type; government-backed cover up to 300 million SDR [2]
SMR designs (BARC) BSMR-200 (220 MWe PWR); SMR-55 (55 MWe PWR); HTGCR (up to 5 MWth, for hydrogen production) [1]
Ministerial reply Dr Jitendra Singh, Union Minister of State for Atomic Energy [1]

5. Multi-Dimensional Analysis

Economic

  • ₹20,000 crore Budget outlay signals a major capital push into indigenous nuclear technology manufacturing [6].
  • Opens a new private-investment avenue in a historically state-monopoly sector, potentially crowding in domestic and foreign capital [3].

Scientific / Technological

  • Indigenous SMR designs (BSMR-200, SMR-55, HTGCR) reduce import dependence and target niche uses — grid power and hydrogen production via high-temperature process heat [1].
  • SMRs allow modular, faster-to-build reactors compared to large conventional plants, aiding scale-up toward the 2047 target [1].

Legal / Constitutional

  • SHANTI Act, 2025 is a landmark statutory reform, replacing two long-standing laws (1962 Act, 2010 Liability Act) with a unified framework [3].
  • Grants the AERB a stronger, more clearly defined regulatory mandate applied on an entity- and technology-neutral basis [2].

Governance / Administrative

  • Graded civil liability (₹100–3,000 crore) recalibrates risk allocation between operators and the state, intended to attract private/foreign entrants while retaining safety accountability [2].
  • DAE remains nodal department; implementation execution likely to be split between DAE/NPCIL and new private entrants under AERB oversight [1][2].

Environmental

  • Nuclear scale-up is positioned as a decarbonisation lever, aligned with India's net-zero-by-2070 commitment [1].

6. Recent Developments (last 12–18 months)

  • Feb 2025: Union Budget 2025–26 announces Nuclear Energy Mission with ₹20,000 crore outlay [6].
  • 15 Dec 2025: SHANTI Bill, 2025 introduced in Lok Sabha [5].
  • 17–18 Dec 2025: Passed by Lok Sabha and Rajya Sabha respectively [5].
  • 21 Dec 2025: Presidential assent granted, SHANTI Act, 2025 enacted [3][5].
  • 2026: PIB workshop held on SHANTI Act implementation and public-private partnership roadmap for 100 GW target [4].
  • 22 Jul 2026: Parliament informed via PIB press release on BARC's SMR design progress and mission status [1].

7. Prelims Hooks

  • Nuclear Energy Mission announced in Union Budget 2025–26 with an outlay of ₹20,000 crore [6].
  • Target: 100 GWe nuclear capacity by 2047 [1].
  • Target: at least five indigenous SMRs operational by 2033 [1].
  • Nodal department: Department of Atomic Energy (not Ministry of Power) [1].
  • BSMR-200: 220 MWe pressurised water reactor designed by BARC [1].
  • SMR-55: 55 MWe reactor designed by BARC [1].
  • HTGCR: up to 5 MWth, designed for hydrogen production [1].
  • SHANTI Act, 2025 received Presidential assent on 21 December 2025 [3][5].
  • SHANTI Act replaces the Atomic Energy Act, 1962 and the Civil Liability for Nuclear Damage Act, 2010 [3].
  • SHANTI Act allows private sector participation in setting up nuclear facilities under Central Government license [2].
  • Graded civil liability under SHANTI Act ranges from ₹100 crore to ₹3,000 crore depending on facility type [2].
  • AERB (Atomic Energy Regulatory Board) provides regulatory oversight, applied on an entity- and technology-neutral basis [2].
  • SHANTI Bill was passed by Lok Sabha on 17 December 2025 and Rajya Sabha on 18 December 2025 [5].
  • Parliamentary reply on NEM status given by Dr Jitendra Singh, MoS for Atomic Energy [1].
  • Net-zero carbon emissions target referenced alongside the mission: 2070 [1].

8. Mains Relevance

9. Related Topics to Study Next

  • Atomic Energy Act, 1962 / Civil Liability for Nuclear Damage Act, 2010 — the predecessor laws now replaced by SHANTI Act [3].
  • NPCIL (Nuclear Power Corporation of India Ltd) — existing public-sector nuclear operator, relevant to capacity roadmap.
  • International nuclear liability regimes (CSC — Convention on Supplementary Compensation) — referenced via SDR-based liability cap [2].
  • India's Net Zero 2070 commitment — broader climate policy this mission feeds into [1].
  • National Green Hydrogen Mission — linked via HTGCR's hydrogen-production application [1].
  • AERB's regulatory reforms — statutory status and entity-neutral oversight model [2].
  • Make in India / Atmanirbhar Bharat in strategic sectors — indigenous SMR design as case study [1].

10. Common Errors / Trap Areas

  • Confusing the nodal department (DAE) with Ministry of Power or Ministry of New and Renewable Energy — nuclear remains under DAE [1].
  • Mixing up SMR capacities: BSMR-200 is 220 MWe (name suggests 200, actual capacity 220), SMR-55 is 55 MWe, HTGCR is MWth (thermal, not electric) [1].
  • Treating SHANTI Act as merely a liability law — it is a consolidated framework replacing both the 1962 Act and 2010 Liability Act, not an amendment to just one [3].
  • Confusing the 100 GWe by 2047 target with the SMR-specific five reactors by 2033 sub-target — these are distinct milestones [1].
  • Net-zero year confusion — India's national net-zero target is 2070, distinct from other countries' 2050 targets [1].

Sources

  1. 1Parliament Question: Nuclear Energy Mission for Viksit Bharatpib.gov.in · tier 1
  2. 2Parliament Question: India's Nuclear Energy Sectorpib.gov.in · tier 1
  3. 3Summary of the SHANTI Bill, 2025prsindia.org · tier 1
  4. 4PIB Workshop on SHANTI Act, 2025pib.gov.in · tier 1
  5. 5SHANTI Bill, 2025 (introduction/passage)pib.gov.in · tier 1
  6. 6Nuclear Power in Union Budget 2025-26 (DAE)static.pib.gov.in · tier 1
At the end · practice MCQs
12 questions on this item
Check the answer for each question, or reveal all at once.
Practice MCQs →