Over 48 Lakh Households Benefit Under PM Surya Ghar: Muft Bijli Yojana Since February 2024

I have sufficient facts from Tier-1 (pib.gov.in) sources. Writing the study note now.

1. At a Glance

2. Why in the News

3. Background & Evolution

4. Core Static Facts

Parameter Detail
Full name PM Surya Ghar: Muft Bijli Yojana [S1]
Launch date 15 February 2024 [S2]
Implementing ministry Ministry of New and Renewable Energy (MNRE) [S1]
Target 1 crore households with rooftop solar by March 2027 [S3]
Total outlay Rs 75,021 crore (Cabinet-approved) [S4]
Subsidy structure 60% subsidy on unit cost up to 2 kW; 40% for 2-3 kW additional capacity [S3]
Subsidy amounts Rs 30,000 (1 kW), Rs 60,000 (2 kW), Rs 78,000 (3 kW or more) [S3]
Loan facility Collateral-free loans via 12 Public Sector Banks at 6.75% subsidised interest, up to Rs 2 lakh [S3]
Projected capacity addition 30 GW rooftop solar in residential sector [S2]
Projected electricity generation 1000 BUs over 25-year system lifetime [S2]
Projected CO2 reduction 720 million tonnes over 25 years [S2]
Projected annual govt savings Rs 75,000 crore in electricity costs [S2]
Application portal www.pmsuryaghar.gov.in (National Portal) [S1]
Eligibility All grid-connected residential consumers with local DISCOM connection, including rural households [S1]
Cumulative achievement (as of 28 Jul 2026) 39,72,447 RTS systems installed; 48,02,717 households benefited [S1]
FY 2025-26 performance 18.71 lakh RTS installed; 6.7 GW capacity added; 22.71 lakh households benefited [S1]

5. Multi-Dimensional Analysis

Economic - Direct household savings via reduced/zero electricity bills — over 7.7 lakh households reported zero bills in an earlier PIB update [S8]. - Projected Rs 75,000 crore/year savings for government exchequer on power procurement [S2]. - Creates demand for domestic solar module manufacturing, linking with PLI/Make in India for solar cells.

Environmental - Targets 30 GW rooftop solar capacity, contributing to India's overall renewable energy and Panchamrit/NDC targets [S2]. - Estimated CO2 abatement of 720 million tonnes over 25-year system life [S2].

Administrative - Demand-driven, application-based model routed through DISCOMs and the national portal — success depends on DISCOM readiness for net-metering and grid integration [S1]. - Loan/subsidy disbursement mechanism through 12 PSU banks tests financial inclusion architecture [S3].

Social - Explicitly includes rural households as eligible beneficiaries, extending energy access equity beyond urban rooftops [S1]. - "Muft Bijli" (free electricity) framing targets household energy cost burden relief for low/middle income consumers.

Scientific/Technological - Involves rooftop solar PV technology deployment at scale, net-metering integration with DISCOM grids.

6. Recent Developments (last 12-18 months)

7. Prelims Hooks

8. Mains Relevance

9. Related Topics to Study Next

10. Common Errors / Trap Areas

11. Sources