Ken-Betwa link project

Geography glossary

Topic: Water Resources of India: Availability, Use and Conservation · NCERT: Beyond NCERT

Meaning

The Ken–Betwa Link Project (KBLP) is a river-linking scheme. A dam on the Ken river, the Daudhan Dam, stores water, and a canal carries that water to the Betwa basin in the drought-hit Bundelkhand region of Madhya Pradesh and Uttar Pradesh. It is the first priority project under the National Perspective Plan (NPP) to reach the construction stage [1].

It matters because it is India's test case for river linking. It promises irrigation and drinking water to a dry region. It also floods part of Panna Tiger Reserve and displaces villages.

Explanation

Why it was planned

  • Bundelkhand faces repeated drought.
  • The region covers parts of MP and UP.
  • Farms and towns here often run short of water.

  • Inter-basin transfer means moving water through canals, tunnels or lifts. It goes from a surplus basin (one with more water than it needs) to a deficit basin (one with less water than it needs).

  • The plan treats the Ken as the surplus river and the Betwa side as the deficit area.

  • National Perspective Plan (NPP), 1980: the national plan for moving water between basins. It was drawn up by the Ministry of Irrigation, now the Ministry of Jal Shakti.

  • NWDA (National Water Development Agency, set up in 1982) studies the links.
  • The NPP lists 30 links: 16 in the Peninsular component and 14 in the Himalayan component.
  • Ken–Betwa is the first of these links to be built [1].

The two rivers

  • Both the Ken and the Betwa rise in the Vindhyan–Kaimur uplands of Madhya Pradesh.
  • Both flow north and join the Yamuna in UP.
  • So the project links two tributaries of the Yamuna. Both lie inside the larger Ganga system.

How it works (its parts)

  • Daudhan Dam: 96.7 m high. It stands on the Ken in Panna and Chhatarpur districts, MP, about 40 km from Khajuraho [1].
  • The dam stores Ken water in a reservoir.

  • Ken–Betwa Link Canal: 216.465 km long. It carries the stored water to Barua Sagar near Jhansi, in the Betwa basin [1].

  • Other parts: the Lower Orr Project, the Kotha Barrage and the Bina Complex Multipurpose Project [1].
  • The result: what it is planned to give [1]:
Benefit Planned figure
Irrigation 10.62 lakh ha
Drinking water about 62 lakh people
Hydropower 103 MW
Solar power 27 MW

Cost, status and the price paid

  • Total cost: ₹44,605 crore [1].
  • Foundation stone: laid by the Prime Minister on 25 December 2024 [1].
  • Status (August 2026): the dam is being built, but canal work has not started [1].
  • Target completion: 2030 [1].
  • Costs to nature and people:
  • The reservoir will flood part of Panna Tiger Reserve.
  • 22 villages in MP are affected: 8 in Panna and 14 in Chhatarpur [1].
  • MP announced a special resettlement package in 2023 (help to move and rebuild the lives of displaced families) [1].

Where it occurs

  • Region: Bundelkhand, spread across Madhya Pradesh and Uttar Pradesh.
  • Dam site: Daudhan, on the Ken, in Panna and Chhatarpur districts (MP), near Khajuraho [1].
  • Canal end point: Barua Sagar near Jhansi (UP), in the Betwa basin [1].
  • Districts that benefit [1]:
  • Madhya Pradesh: Chhatarpur, Niwari, Tikamgarh, Panna, Sagar, Damoh, Datia, Vidisha, Shivpuri, Raisen.
  • Uttar Pradesh: Banda, Mahoba, Jhansi, Lalitpur.

  • Who plans it: it falls under the NPP (1980). Links under the plan are studied by the NWDA (1982), under the Ministry of Jal Shakti.

  • Affected protected area: Panna Tiger Reserve (MP).

Don't confuse with

  • Polavaram Project: it is also a working link, but between the Godavari and the Krishna in Andhra Pradesh. It was declared a national project under Section 90 of the AP Reorganisation Act 2014 [2]. Ken–Betwa links two Yamuna tributaries in MP and UP.
  • Direction of transfer: water moves from the Ken to the Betwa, not the other way. The Daudhan Dam is on the Ken, not on the Betwa.
  • Kalasa–Banduri project: this moves water from a west-flowing river (the Mahadayi, Arabian Sea basin) east into the Malaprabha (Krishna basin), and it is the subject of an inter-state tribunal. In Ken–Betwa, both rivers flow north into the same river, the Yamuna.
  • Periyar diversion / Indira Gandhi Canal: these are older inter-basin transfers that are already built (Kerala → Tamil Nadu; Harike → Rajasthan). Ken–Betwa is the first NPP link to reach construction.

Prelims Hooks

  • Ken–Betwa is the first link under the NPP (1980) to be built. The NPP lists 30 links: 16 Peninsular + 14 Himalayan.
  • Daudhan Dam: on the Ken, in Panna–Chhatarpur (MP), 96.7 m high, about 40 km from Khajuraho [1].
  • The link canal is 216.465 km long and ends at Barua Sagar near Jhansi [1].
  • Both the Ken and the Betwa rise in the Vindhyan–Kaimur uplands (MP) and are tributaries of the Yamuna. Trap: they are not direct tributaries of the Ganga, and not part of the Narmada system.
  • Foundation stone: 25 December 2024. Cost: ₹44,605 crore. Target: 2030 [1].
  • Planned benefits: 10.62 lakh ha irrigated, about 62 lakh people given drinking water, 103 MW hydropower plus 27 MW solar [1].

Mains Points

  • Promise for a drought-hit region (GS-III):
  • Bundelkhand suffers repeated drought. Ken–Betwa aims to irrigate 10.62 lakh ha and supply drinking water to about 62 lakh people in 14 districts of MP and UP [1].
  • This can steady farm incomes and lower the risk when the monsoon fails.

  • Ecological and social costs:

  • The reservoir floods part of Panna Tiger Reserve.
  • 22 villages are affected, which led to MP's 2023 resettlement package [1].
  • Wider worries about river linking also apply here: whether the "surplus" water really exists, sediment trapped behind dams, and high costs.

  • A balanced view:

  • Slow progress (dam under way, canal not started as of August 2026) shows how hard big links are to carry out [1].
  • Link basins only where a real surplus exists.
  • Combine linking with local fixes: watershed management (caring for the land that drains into a stream), rainwater harvesting and better water-use efficiency.

Related concepts

Read more

Sources

  1. 1Ken-Betwa Link Project — Frequently Asked Questions (21 August 2026), PIBstatic.pib.gov.in · tier 1
  2. 2Performance Audit Report on Polavaram Irrigation Project, Chapter I: Introduction, CAG (2025)cag.gov.in · tier 1